PAST MOBILE PROJECTS

Providing Enterprise-grade Integrated Technology Solutions

CASE STUDIES

MINNESOTA STATE FAIRGROUNDS IDAS/ODAS PROJECT

The oDAS covers 350 square acres and the iDAS covering the Grand Stand and Coliseum, MPMS was the 3rd party owner of this DAS and design/built the system on the fairgrounds from the head-end shelters housing the ‘brains’ of the system to the in-ground fiber infrastructure and RF design of the project.  The DAS consists of 12 geographical zones supported by 58 large 30 in. x 30 in. panel antennas and all 4 of the big carriers are participating in this solution.

US BANK STADIUM

MPMS was asked to be a subcontractor for a large carrier to install their head-end equipment and test and terminate all of their fiber at the head-end location.